‘Corruption Killed My Parents’
[…] ,” Cao said. “It’s the system. The signal system went into operation without testing and that only happens when bribes are paid.” Officials determined that “serious design flaws” in the signal control system used at Wenzhou South Railway Station were behind the crash. The equipment was designed by state-run Beijing National Railway […]